A requirement arrives in words and leaves as criteria. Standardisation happens before matching, never the other way round. A smaller file with known edges is preferred to a larger one without.
Repeat control
Removing duplicates within the file and against anything previously supplied to you.
Specification drafting
Writing down the field list, definitions and rules, so the same build can be repeated later.
Scope agreement
Turning a written requirement into countable criteria, and confirming the size before any records are assembled.
Bring the file you already have and we will tell you what is still usable.